Long garden strip in Spalding cleared to bare earth between houses, seen from the air
East Anglia

Menage construction in East Anglia, built for Fen ground

Menage construction in East Anglia is a drainage job first. The Fens are flat, the water table sits high and peat shrinks. From our base at Manor Barn, Newton, near Wisbech, we build ménages and riding arenas across Norfolk, Lincolnshire, Cambridgeshire and Suffolk with drainage designed for this ground.

  • 100 milesfrom Wisbech, or national
  • 80 m³concrete pumped at Walpole St Peter
  • £10minsurance through First Point

Get a free site visit

Haydn calls you back, looks at the ground and prices the job.

Or call Haydn on 01945 669203.

The ground

Why Fen ground changes how a ménage is built

Flat land. Fen fields are often within a few centimetres of level over hundreds of metres. That sounds ideal for an arena, until you need the water to go somewhere. With no natural fall, every drop has to be designed off the arena with built-in falls and a carrier pipe to an outfall.

High water tables. Much of the Fens was drained by dykes and pumps and sits near or below sea level. In winter the water table rises close to the surface. A soakaway that works in August fills in January. Drains have to discharge to a dyke or ditch that is actually lower than the arena.

Peat and silt. The black fens around Ramsey, Chatteris and Ely are peat, which is soft and shrinks as it dries. The silt fens round Wisbech, Holbeach and Spalding are firmer but hold water. Peat needs stripping to a stable formation and a deeper stone base. Silt needs close-spaced drainage.

Drainage design

Arena drainage that works in the Fens

On Fen ground we design the drainage before anything else. Levels are taken across the site and to the nearest dyke. The arena is laid to a deliberate fall, herringbone laterals feed a carrier pipe, and the carrier discharges to a ditch or dyke below arena level. Many Fen dykes are run by Internal Drainage Boards, and new outfalls go to the board for consent. We plan the route with that in mind.

Ditching and culverts are on our service list, so if the ditch needs cleaning or a new culvert to take the outfall, it is part of the same job. More on the method in horse arena drainage and sub-base.

Proof

Groundworks on Fen ground, every week

Our working week is Fen ground. At Weston Hills near Spalding we put Plot 2 on piles and a ring beam because the ground needed it. At Walpole St Peter we dug 2 m deep footings, pumped 80 m³ of concrete and took 600 tonnes of soil off site in a week. At Holbeach we laid 180 m of ducting and 7 jointing pits. At Ramsey we did the road drainage and plot groundworks for a nine-home development. At Whittlesey we poured grain store floors and aprons, and at Sutton St James we built a yard, bays and wash bay with ACO drainage for RJ Wright Ltd.

Every one of those jobs is about getting levels right and water away on flat, wet ground. That is what a Fen ménage needs.

Riding country

Across Norfolk, Lincolnshire, Cambridgeshire and Suffolk

  • The Fens. Wisbech, March, Whittlesey, Chatteris, Ramsey and Ely: silt and peat, high water, IDB dykes everywhere.
  • Lincolnshire. Spalding, Holbeach, Long Sutton and Boston on the silt fens, up to the Wolds where chalk and slopes bring cut and fill.
  • Norfolk. King's Lynn and the Marshland villages on silt, Breckland's sandy free-draining soils, and heavier clay towards Norwich.
  • Cambridgeshire. Fen edge and clay uplands, from Peterborough to Cambridge.
  • Suffolk. Newmarket's racing country and the sandy heaths, where a perimeter drain is often enough.

Different ground, different spec. Breckland sand often needs only a perimeter drain. Fen clay needs a full herringbone. We price the ground you have.

Book

A free site visit from Haydn

We are based near Wisbech and build within 100 miles, or nationally. Haydn visits, takes levels, finds the outfall and checks access for lorries. Then you get a written price. For a typical UK range first, a full 40x20 m installation runs £20,000 to £40,000, with poor ground or access adding 25 to 50% (Checkatrade, 2026). Try the ménage cost calculator or read the full horse ménage construction service.

Reviews

What customers say about Haydn and the team

“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
Marc MatthewsRecommends HB Developments on Facebook, October 2024
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
George WrightRecommends HB Developments on Facebook, February 2024
“Excellent service fast and efficient 💪”
Tom WrightRecommends HB Developments on Facebook, January 2024
Questions

Ménage questions, answered

Anything else, ring Haydn on 01945 669203.

Do you build ménages in Norfolk and Suffolk?

Yes. We build within 100 miles of Wisbech, which covers all of Norfolk and Suffolk, including Newmarket, or nationally.

Can you build a ménage on peat?

Yes. We strip back to a stable formation, replace soft ground with stone, use a deeper rolled base and design the drainage for a high water table.

Why do Fen arenas need more drainage?

Flat land gives water no natural fall, and the winter water table rises high. The arena needs designed falls and a carrier drain to a dyke or ditch below arena level.

Do I need Internal Drainage Board consent?

If your outfall goes into a dyke managed by an Internal Drainage Board, the board expects an application before it is connected. We plan the outfall with that in mind.

Where are you based?

Manor Barn, Fitton End Road, Newton, Wisbech PE13 5EL, on the Cambridgeshire, Lincolnshire and Norfolk border. Call Haydn on 01945 669203.

Book a free site visit

Tell us about the job. Haydn comes out, looks at the ground and the access, and gives you a price.

Call HaydnGet a price