S278 works and Section 38 estate roads for developers
Your homes do not sell until the road is in. HB Developments delivers S278 works on the public highway and Section 38 estate roads for developers and housebuilders, with street works (NRSWA) qualified operatives. We completed the road drainage on a nine-home scheme at Ramsey and built a permeable road at Surfleet.
- 9homes at Ramsey, road drainage complete
- 6homes at Surfleet, permeable road in
Section 278 works on the public highway
A Section 278 agreement lets a developer alter the existing public highway to serve a new site: a bellmouth junction, a widened carriageway, a new footway, dropped kerbs, crossings or street lighting. The highway authority designs and approves, you pay for the works, and the contractor builds them to the authority's specification under inspection.
Working in a live road needs the right people. Our operatives hold street works (NRSWA) qualifications, sites run under SMSTS site management, and we carry £10 million of insurance through First Point. That is what the authority and your client want to see before the barriers go up.
Section 38 works: estate roads built for adoption
Under Section 38 the council agrees to adopt the new estate roads once they are built to standard and maintained through the defects period. The road is built in stages that suit the sales programme:
- Dig out, formation and capping.
- Road drainage: gullies, carrier drains and connections.
- Kerbs and sub-base, with the base course laid as a haul road during the build.
- Footways, crossings and service strips.
- Surface course once the heavy traffic has finished, ready for adoption.
Our guide to section 38 vs section 278 sets out who signs what.

Estate roads and road drainage we have delivered
Ramsey, nine homes. For Rose Homes we completed the plot groundworks, the foul drainage with a 3.5 m deep road sewer connection and the storm drainage, then handed the plots to the bricklayers. We are main contractor on site and return to complete the road surfacing, paths and patios.
Surfleet, six homes. For Ark Property Centre we carried the groundworks and the brickwork, then built a permeable road that now serves plots 1 and 2. Muck away and full site clearance were completed and the site prepped for plot 3.
Phasing the road with the plots keeps the site accessible, keeps the haul route clean and gets completed homes to buyers sooner.

Permeable roads and private drives
Not every estate road is adopted. Private drives and shared surfaces on small schemes often go permeable, so rain soaks through the block paving into a stone reservoir and never overloads the drains. We build the full depth: geotextile, open-graded sub-base, bedding and the blocks, laid to the pattern on your drawings.
Sewers that run under the road are their own package: see sewer connections and utility ducting and our Section 104 agreement guide.
Roads that keep your sales programme moving
The road is the spine of the site. Get it wrong and plots go out of sequence, deliveries churn up the haul route and buyers walk across mud to a show home. We build the drainage and base course early so the site has a clean, working road for the whole build, then come back for kerbs, footways and the surface once the heavy work is done. That is exactly how Ramsey runs: drainage and plots done, permeable road and externals to follow once the scaffold comes down.
Road packages we price
S278 highway works
Junctions, widening, footways and dropped kerbs.
S38 estate roads
Built in stages to adoption standard.
Road drainage
Gullies, carriers and connections, as at Ramsey.
Kerbs and footways
Kerbs, edgings and footway construction.
Permeable roads
Full-depth permeable construction, as at Surfleet.
Street works
NRSWA qualified operatives for work in the highway.
Jobs that prove it
Real jobs, named places, our own photos.
What customers say about Haydn and the team
“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
“Excellent service fast and efficient 💪”
Questions we get asked
Anything else, ring Haydn on 01945 669203.
What is the difference between S38 and S278 works?
Section 38 covers new estate roads that the council adopts once complete. Section 278 covers changes to the existing public highway, such as a new junction into your site. Many schemes need both.
Are your operatives qualified to work in the highway?
Yes. We hold street works (NRSWA) qualifications, run sites under SMSTS site management and every employee carries a CSCS card.
Can you build the road and the plots?
Yes. At Ramsey and Surfleet we did the plot groundworks and the road works on the same site, so one contractor runs the programme.
Do you work outside East Anglia?
Yes. Developer work is nationwide, from our base near Wisbech.
How do I get a price?
Send drawings, plot numbers and a start date, or call Haydn on 01945 669203.
Can you build the road in phases?
Yes. Drainage and base course go in early as a working haul road, with kerbs, footways and the surface course finished once the heavy work is done.
Send the drawings, get a priced package
Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.