Groundworks in Surfleet: six new builds for Ark Property and MDG
Groundworks in Surfleet for Ark Property and MDG Enterprises: six new builds on challenging ground, with foundations as wide as 2.9 m. We poured 600 m³ of concrete, mucked away 4,000 tonnes, formed the site entrance and ran the groundworks, brickwork, site management and plant hire across the whole site.
- 600 m³of concrete poured
- 4,000tonnes mucked away
- 2.9 mwidest foundations on site
- Client
- Ark Property and MDG Enterprises
- Location
- Surfleet, Lincolnshire
- Scope
- Groundworks and brickwork packages, site management and plant hire for 6 new builds
- Status
- Plots 1 and 2 finished; permeable road half completed, the rest completed by the end of 2026
Groundworks, brickwork and site management in one package
Ark Property and MDG Enterprises are building six new homes at Surfleet, north of Spalding. They gave us the groundworks and brickwork packages and the site management, with plant hire across the site.
That covers supply and fit groundworks from the foundations and drainage right through to patios and block paving, plus the labour and plant for all the brickwork.

Challenging ground and foundations 2.9 m wide
The ground at Surfleet would not carry a standard strip footing. The engineer's answer was wide, reinforced foundations, some of them 2.9 m across. That is a lot of steel, a lot of concrete and a lot of spoil: 600 m³ poured and 4,000 tonnes taken away.
We dug, fixed the mesh, and pumped the concrete in planned pours, with the site entrance formed early so lorries could come and go without stopping the gangs. Read why soft Fen ground changes the foundation design in our piled vs strip foundations guide.
On site, stage by stage
Our own photographs from the job.











From foundations to block paving
- Foundations up to 2.9 m wide, reinforced and pumped.
- Drainage and services for every plot.
- Labour and plant for all the brickwork.
- Site entrance formed.
- Permeable road: half completed for Plots 1 and 2, the rest completed by the end of 2026.
- Patios and block paving.
- Site management and plant hire across the site.

Finished homes and a road that drains
Plots 1 and 2 are finished, with the block-paved road in front of them. The permeable road lets rainwater pass straight through into a stone sub-base instead of running to a gully. The rest of the road is completed by the end of 2026.
One firm carrying the groundworks, the brickwork and the site management means one programme and one phone number for the developer. Got a scheme like it? Send the drawings through the form and see our new build contractors page.
How we run a package like this
Every job starts with the drawings and a conversation with Haydn, the director. He prices the package line by line, agrees the programme with your site manager and stays the point of contact until the last load leaves site. Our sites run under SMSTS site management, every employee carries a CSCS card, every plant operator holds the relevant tickets, and we carry £10 million of insurance through First Point.
Send the drawings through the form at the top of this page, or call Haydn, and you will have a priced package back with a start date.
The Surfleet package
Groundworks
Foundations, drainage, services, patios and block paving.
Brickwork
Labour and plant for all the brickwork.
Site management
Run by our own SMSTS site management.
Plant hire
Our plant across the whole site.
Concrete
600 m³ poured.
Muck away
4,000 tonnes taken off site.
More of our jobs
Real jobs, named places, our own photos.

Nine homes for Rose Homes
Main contractor: ring beams, block and beam, plot drainage and a 3.5 m deep road sewer connection.
See the job
175 Hawthorn Bank, design and build
A bespoke four-bed home for Ringwood and Simpson, every trade from piling to decorating run by us.
See the job
Groundworks and brickwork for Fosters
320 m³ poured, 600 tonnes exported, 390 m² of block paving and 30,000 bricks laid, built with disability in mind.
See the jobWhat customers say about Haydn and the team
“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
“Excellent service fast and efficient 💪”
About this job
Anything else, ring Haydn on 01945 669203.
Who is the client at Surfleet?
Ark Property and MDG Enterprises. We carry the groundworks and brickwork packages, the site management and the plant hire.
Why were the foundations so wide?
The ground was challenging, so the design spread the load on reinforced foundations as wide as 2.9 m.
How much concrete went in?
600 m³ of concrete was poured and 4,000 tonnes of spoil mucked away.
Is the road finished?
The permeable road is half completed for Plots 1 and 2. The rest is completed by the end of 2026.
Do you do the brickwork as well?
Yes. At Surfleet we supply the labour and plant for all the brickwork, as well as the groundworks.
Send the drawings, get a priced package
Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.