Two finished brick homes with a block-paved road on the Surfleet development
Case study: six new builds, Surfleet

Groundworks in Surfleet: six new builds for Ark Property and MDG

Groundworks in Surfleet for Ark Property and MDG Enterprises: six new builds on challenging ground, with foundations as wide as 2.9 m. We poured 600 m³ of concrete, mucked away 4,000 tonnes, formed the site entrance and ran the groundworks, brickwork, site management and plant hire across the whole site.

  • 600 m³of concrete poured
  • 4,000tonnes mucked away
  • 2.9 mwidest foundations on site

Send your scheme for a price

Goes straight to Haydn Buffham, the director.

Prefer to talk? Call Haydn on 01945 669203.

Client
Ark Property and MDG Enterprises
Location
Surfleet, Lincolnshire
Scope
Groundworks and brickwork packages, site management and plant hire for 6 new builds
Status
Plots 1 and 2 finished; permeable road half completed, the rest completed by the end of 2026
The brief

Groundworks, brickwork and site management in one package

Ark Property and MDG Enterprises are building six new homes at Surfleet, north of Spalding. They gave us the groundworks and brickwork packages and the site management, with plant hire across the site.

That covers supply and fit groundworks from the foundations and drainage right through to patios and block paving, plus the labour and plant for all the brickwork.

Steel mesh laid in a wide foundation trench on the Surfleet development
Steel mesh laid in a wide foundation trench on the Surfleet development
The challenge

Challenging ground and foundations 2.9 m wide

The ground at Surfleet would not carry a standard strip footing. The engineer's answer was wide, reinforced foundations, some of them 2.9 m across. That is a lot of steel, a lot of concrete and a lot of spoil: 600 m³ poured and 4,000 tonnes taken away.

We dug, fixed the mesh, and pumped the concrete in planned pours, with the site entrance formed early so lorries could come and go without stopping the gangs. Read why soft Fen ground changes the foundation design in our piled vs strip foundations guide.

Photos from the job

Our own photographs from the job.

Concrete pump and mixer pouring foundations on the Surfleet site at sunrise
Concrete pump and mixer pouring foundations on the Surfleet site at sunrise
Groundworkers in deep reinforced foundation trenches on the Surfleet development
Groundworkers in deep reinforced foundation trenches on the Surfleet development
Top-down drone view of foundation trenches dug on the Surfleet site
Top-down drone view of foundation trenches dug on the Surfleet site
Brickwork going up from the scaffold on a Surfleet plot
Brickwork going up from the scaffold on a Surfleet plot
Finished block-paved road leading into the Surfleet development
Finished block-paved road leading into the Surfleet development
Rear of a finished brick home on the Surfleet development
Rear of a finished brick home on the Surfleet development
Two finished homes with block-paved drives on the Surfleet development, seen from the air
Two finished homes with block-paved drives on the Surfleet development, seen from the air
Top-down drone view of slabs and footings on the Surfleet development for Ark Property Centre
Top-down drone view of slabs and footings on the Surfleet development for Ark Property Centre
L-shaped footing with brick starter piers and pallets of bricks on the Surfleet development
L-shaped footing with brick starter piers and pallets of bricks on the Surfleet development
Finished new homes and block-paved drive at the Surfleet development
Finished new homes and block-paved drive at the Surfleet development
Drone view of the finished homes and paved access at Surfleet
Drone view of the finished homes and paved access at Surfleet
What we did

From foundations to block paving

  • Foundations up to 2.9 m wide, reinforced and pumped.
  • Drainage and services for every plot.
  • Labour and plant for all the brickwork.
  • Site entrance formed.
  • Permeable road: half completed for Plots 1 and 2, the rest completed by the end of 2026.
  • Patios and block paving.
  • Site management and plant hire across the site.
Kerbs set and stone laid for the permeable road at Surfleet, excavator behind
Kerbs set and stone laid for the permeable road at Surfleet, excavator behind
The outcome

Finished homes and a road that drains

Plots 1 and 2 are finished, with the block-paved road in front of them. The permeable road lets rainwater pass straight through into a stone sub-base instead of running to a gully. The rest of the road is completed by the end of 2026.

One firm carrying the groundworks, the brickwork and the site management means one programme and one phone number for the developer. Got a scheme like it? Send the drawings through the form and see our new build contractors page.

Working with us

How we run a package like this

Every job starts with the drawings and a conversation with Haydn, the director. He prices the package line by line, agrees the programme with your site manager and stays the point of contact until the last load leaves site. Our sites run under SMSTS site management, every employee carries a CSCS card, every plant operator holds the relevant tickets, and we carry £10 million of insurance through First Point.

Send the drawings through the form at the top of this page, or call Haydn, and you will have a priced package back with a start date.

The package

The Surfleet package

01

Groundworks

Foundations, drainage, services, patios and block paving.

02

Brickwork

Labour and plant for all the brickwork.

03

Site management

Run by our own SMSTS site management.

04

Plant hire

Our plant across the whole site.

05

Concrete

600 m³ poured.

06

Muck away

4,000 tonnes taken off site.

Reviews

What customers say about Haydn and the team

“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
Marc MatthewsRecommends HB Developments on Facebook, October 2024
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
George WrightRecommends HB Developments on Facebook, February 2024
“Excellent service fast and efficient 💪”
Tom WrightRecommends HB Developments on Facebook, January 2024
Questions

About this job

Anything else, ring Haydn on 01945 669203.

Who is the client at Surfleet?

Ark Property and MDG Enterprises. We carry the groundworks and brickwork packages, the site management and the plant hire.

Why were the foundations so wide?

The ground was challenging, so the design spread the load on reinforced foundations as wide as 2.9 m.

How much concrete went in?

600 m³ of concrete was poured and 4,000 tonnes of spoil mucked away.

Is the road finished?

The permeable road is half completed for Plots 1 and 2. The rest is completed by the end of 2026.

Do you do the brickwork as well?

Yes. At Surfleet we supply the labour and plant for all the brickwork, as well as the groundworks.

Send the drawings, get a priced package

Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.

Call HaydnGet a price