Aerial view of Weston Hills Plot 2 at roof truss stage under scaffold, beside the finished Plot 1 bungalow
Developers and commercial clients

Groundworks for developers, housebuilders and commercial clients

Groundworks for developers and commercial clients, priced from your drawings: full groundworks packages, main contractor, piling, roads, sewers and drop kerbs, concrete works, wash bays and grain stores, brickwork and our own plant, run under SMSTS site management with £10 million of cover.

  • 9homes for Rose Homes, main contractor
  • 600 m³poured at Surfleet
  • £10minsurance cover

Send your scheme for a price

Goes straight to Haydn Buffham, the director.

Packages you need

Prefer to talk? Call Haydn on 01945 669203.

Packages

Eight packages, one contractor on the plot

Take one package or hand us the whole scheme as main contractor. We build and sell our own homes, so we run your plots the way a developer needs them run.

01

Groundworks packages

Site clearance, footings, oversites, block and beam and plot drainage, plot by plot to your programme, as on nine homes for Rose Homes at Ramsey.

02

Piling and ring beams

Piled foundations for Fen and peat ground, piles cropped and ring beams cast, four plots piled including design at Wiggenhall St Germans.

03

Roads, sewers and drop kerbs

Estate roads, S38 and S278 highway works, deep sewer connections and drop kerbs, by street works (NRSWA) qualified operatives.

04

S104 drainage

Foul and storm sewers laid for adoption, like the 3.5 m deep road sewer connection and hydro brake storm run at Ramsey.

05

Concrete works

Reinforced slabs, yards, aprons, wash bays and power floated grain store floors, laid to falls with interceptors where they are needed.

06

Brickwork

Labour and plant for brickwork packages, from DPC to wall plate: 30,000 bricks supplied and laid at Papworth Everard.

07

Main contractor and full new build

From slab to handover, or the whole site as main contractor. We build and sell our own homes too.

08

Plant hire with operators

Our own 1 to 14 tonne excavators, 1 to 9 tonne dumpers, two telehandlers and a roller, with ticketed operators.

Commercial and agricultural

Concrete works, wash bays and grain stores

Reinforced slabs, yards and aprons laid to drainage falls, with interceptors where oil and wash water need catching. For farms, hauliers, growers and businesses, from Terrington Farms to RJ Wright Ltd and Taylors Bulbs.

How a scheme runs

From tender to handover in five steps

The same sequence on a single plot or a nine-home site, with one point of contact from the first price to the last plot.

Tender

Send drawings, plot numbers and a start date. Haydn prices the packages you need, line by line.

Programme

We agree the sequence with your site manager: plots, roads, drainage and services in the order your sales need them.

Mobilise

Our plant and ticketed operators arrive under SMSTS site management, with CSCS cards and £10 million of cover in place.

Deliver

Footings, slabs, drainage, roads and brickwork, plot by plot, with one point of contact for the whole package.

Hand over

Plots handed back ready for the next trade, or finished homes ready to sell.

Projects

Schemes we have built, plot by plot

Contract sites for developers and our own developments, across Lincolnshire, Cambridgeshire and Norfolk.

Foam glass aggregate spread across the floor of Bourne Town Hall under the timber ceiling
Bourne, LincolnshireBourne Town Hall for Probus

For Probus: excavation to formation with an archaeologist, new drainage, foam glass aggregate, foundations and time capsules for the town hall trust.

HB Developments groundworker setting a drainage chamber in the trench at Newtown Road, Ramsey, with the excavator above
Newtown Road, Ramsey · 9 homesNine homes for Rose Homes

Main contractor for Rose Homes on nine homes: plot groundworks, a 3.5 m deep sewer connection and storm drainage.

Concrete pump and mixer pouring foundations on the Surfleet site at sunrise
Surfleet, Lincolnshire · 6 homesSix new builds for Ark Property and MDG

Groundworks, brickwork, site management and plant hire on six new builds: 600 m³ poured and foundations as wide as 2.9 m.

Roof trusses going on the new home at 175 Hawthorn Bank, seen from the air
Spalding, Lincolnshire · 1 home175 Hawthorn Bank, design and build

Full design and build for Ringwood and Simpson: a bespoke four-bed home, piling to decorating.

Brick steps and retaining walls with railings at Papworth Everard
Papworth Everard, CambridgeshireGroundworks and brickwork for Fosters

For Fosters Building Services: two extensions, a garage, a playroom, retaining walls and a 150 m² porcelain patio.

Cropped piles and ring beam on Weston Hills Plot 2 with a groundworker on site
Weston Hills, Spalding · 2 homesTwo executive bungalows, our own

Our own development: two 3-bed executive bungalows, both sold off plan and completed within 6 months of starting on the foundations.

Our own plant

The machines on your site are ours

No waiting on a hire firm. Every machine below is owned by HB Developments and driven by a ticketed operator. Piling is run through our trusted piling partner today, and our own piling rig arrives by the end of December 2026.

  • Excavators1 tonne, 3 tonne, 8 tonne and 14 tonne
  • Dumpers1 tonne, 3 tonne, 6 tonne and 9 tonne
  • 14 m telehandler3.5 tonne lift
  • 6 m 525 telehandlerSmaller than usual, still a 2.5 tonne lift
  • RollerFor sub-bases, roads and yards
  • AttachmentsNumerous attachments for every machine
In numbers

What our gangs put in the ground

Figures from named jobs, nothing rounded up.

600m³Concrete poured on six new builds at Surfleet
4,000tonnesMucked away from that site
180m125 mm duct laid for Taylors Bulbs, site open throughout
30,000bricksSupplied and laid at Papworth Everard
Credentials

Paperwork your site manager asks for

Held before we mobilise, on every scheme.

£10 million insuranceCover through First Point on every job.
SMSTS site managementSites run by an SMSTS-trained manager.
Street works (NRSWA)Qualified to open and reinstate the highway.
CSCS cardsEvery employee on site carries a CSCS card.
Ticketed plant operatorsAll plant operators hold the relevant tickets.
First aidFirst aid trained on site.
10 year guarantee on new buildsAll new builds have a 10 year guarantee.
Signed off by building controlAll works signed off by building control.
Who we work with

Developers, builders and businesses we have worked with

Housebuilders, main contractors, farms and businesses across Lincolnshire, Cambridgeshire and Norfolk have trusted us with their sites.

  • Probus Ltd
  • Grocott and Murfitt Ltd
  • Ark Property Ltd
  • MDG Enterprises Ltd
  • AJB Group Ltd
  • Rose Homes Ltd
  • B&H Services Ltd
  • Taylors Bulbs Ltd
  • Apex Demolition Ltd
  • Oakwood Homes Ltd
  • Terrington Farms (Thorney) Ltd
  • Ringwood and Simpson Ltd
  • Haywood Homes (EA) Ltd
  • Highstock Homes Ltd
  • RJ Wright Ltd
  • Ashmore Developments Ltd
  • Kempston Homes Ltd

Architects and engineers we work alongside

On our design and build projects, from the first drawing to the finished home.

  • Peter Humphrey Associates
  • TAC Architects
  • Studio 11 Architecture
  • Swann Edwards
  • WE Engineers
  • SE Surveys

Councils and building control we work with

We know the building control teams and their standards across the Fens, Lincolnshire and Norfolk.

  • Fenland District Council
  • South Holland District Council
  • King's Lynn and West Norfolk
  • East Lindsey District Council
  • Boston Borough Council
  • North Norfolk District Council
Coverage

Nationwide for developers, rooted in the Fens

Our base is Manor Barn, Newton, near Wisbech, with projects across Lincolnshire, Cambridgeshire and Norfolk. We take developer schemes anywhere in the country.

  • LincolnshireBourne, Surfleet, Spalding, Holbeach, Wyberton
  • CambridgeshireRamsey, Papworth Everard, Whittlesey
  • NorfolkWalpole St Peter, Wiggenhall St Germans
  • NationwideDeveloper and housebuilder schemes
Price your scheme
Developer questions

Before you send the drawings

Or call Haydn on 01945 669203.

Which packages do you take on?

Groundworks, piling and ring beams, roads, sewers and drop kerbs (S38 and S278), S104 drainage, concrete works including wash bays and grain store floors, brickwork, steel fixing, plant hire, and full new build or main contractor from slab to handover. Price one package or the lot.

How do I send drawings?

Attach them to the tender form on this page (PDF, DWG or photos). If the files are too big for the form, tick the box and we email you for them.

Do you work outside East Anglia?

Yes. Developer work is nationwide. Our base is near Wisbech, on the Cambridgeshire, Lincolnshire and Norfolk border.

Who have you worked for?

Probus (Bourne Town Hall), Rose Homes (nine homes at Ramsey, as main contractor), Ark Property and MDG Enterprises (six homes at Surfleet), Ringwood and Simpson (design and build at 175 Hawthorn Bank, Spalding), Fosters Building Services (Papworth Everard), Taylors Bulbs (180 m of duct at Holbeach), RJ Wright Ltd and more. See the logos further down this page.

Can you do the brickwork as well as the groundworks?

Yes. Surfleet and Papworth Everard were both groundworks and brickwork packages, so one contractor carries the plot from footings to wall plate.

Are your operatives qualified?

Sites are run under SMSTS site management. Every employee holds a CSCS card, every plant operator holds the relevant tickets, we hold street works (NRSWA) qualifications and first aid cover, and we carry £10 million of insurance through First Point.

How fast can you start?

Put your start date on the tender form. Haydn reads it, checks the programme and comes back to you with a price and a date.

Send the drawings, get a priced package

Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.

Call HaydnGet a price