Ducting laid in a trench behind red barriers on the Holbeach utilities job
Holbeach and Long Sutton

Groundworks in Holbeach, Long Sutton and the Gedneys

Groundworks in Holbeach, Long Sutton and the villages between are some of our closest jobs to home. HB Developments has laid 180 m of ducting at Holbeach, built an extension at Long Sutton, finished a chalet bungalow at Gedney Hill and a drive at Sutton Bridge.

  • 180 mof ducting at Holbeach
  • 7jointing pits on the same job
  • 5.0Google rating

Get a free site visit

Haydn calls you back, looks at the ground and prices the job.

Or call Haydn on 01945 669203.

Local jobs

What we have built round Holbeach and Long Sutton

  • Long Sutton: an extension, October 2025. Groundworks and brickwork, supply and fit, from footings to the walls.
  • Holbeach: 180 m of ducting and 7 jointing pits, January 2025.
  • Gedney Hill: footings dug and poured, oversite and kerbs on Highstock Lane, through to a finished four-bed chalet bungalow with a double garage.
  • Sutton Bridge: a brush-finish concrete drive with ACO drains, 2023.
  • Sutton St James: concrete bays with ACO drains, a speed bump, a yard expansion and a wash bay for RJ Wright Ltd, a repeat client.
  • Sutton St Edmund: man and machine hire for a returning customer, February 2025.
For homeowners

Extension groundworks in Holbeach and Long Sutton

The Long Sutton extension is how most of our homeowner jobs run. We dig and pour the footings, lay and connect the drainage, build the blockwork to DPC and lay the oversite. Because we also do brickwork, we carried on and supplied and laid the walls too, so the owner dealt with one firm. See foundations for extensions.

For drives, bases and yards, the Sutton Bridge drive shows the detail that matters: proper falls and ACO drains so water goes where it should. See concrete bases and slabs.

Extension brickwork going up at Long Sutton
Extension brickwork going up at Long Sutton
Ground conditions

Building on South Holland silt

Holbeach, Long Sutton and the Gedneys sit on the silt of the old Wash marshes, cut through by drains running out to the sea. Good, even silt carries a house on ordinary footings. Soft patches, old dyke lines and a high water table on the lower ground towards Gedney Drove End and Lutton change that from plot to plot.

We look at the ground first, then price strip or trench fill footings or piles and a ring beam. Planning and building control here run through South Holland District Council, Lincolnshire County Council handles the highway, and the drainage board consents any work near its dykes.

Farms and businesses

Yards, wash bays and utilities

South Holland runs on farming and haulage, and so does a good share of our work. The RJ Wright yard at Sutton St James is the model: a heavy-duty concrete bay laid to falls into ACO drains, a speed bump, the yard extended and a wash bay finished in January 2024. The Holbeach ducting job put 180 m of duct and 7 jointing pits in the ground for new services. See hardstanding and yards and utility ducting.

Finished concrete wash bay with a traffic cone and an R. J. Wright Ltd lorry behind
Finished concrete wash bay with a traffic cone and an R. J. Wright Ltd lorry behind
New homes

Self-builds and new homes in the Gedneys

Gedney Hill shows the full run. We dug and poured the footings, laid the oversite and the kerbs, and saw the job through to a finished four-bed chalet bungalow with a double garage. Our own homes at Weston Hills, on the other side of Holbeach, went the same way, and both sold off plan.

If you own a plot in the villages, our self-build service takes it from bare ground to the keys, with £10 million of insurance through First Point behind every stage. See the Gedney Hill bungalow.

What you get

Villages we cover

01

Holbeach and around

Holbeach, Fleet, Holbeach St Marks, Whaplode and Moulton.

02

Long Sutton and around

Long Sutton, Lutton, Sutton Bridge, Tydd St Mary and Gedney.

03

The Gedneys and Suttons

Gedney Hill, Gedney Drove End, Sutton St James and Sutton St Edmund.

04

Next door

Spalding and Wisbech. Spalding, Wisbech.

Reviews

What customers say about Haydn and the team

“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
Marc MatthewsRecommends HB Developments on Facebook, October 2024
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
George WrightRecommends HB Developments on Facebook, February 2024
“Excellent service fast and efficient 💪”
Tom WrightRecommends HB Developments on Facebook, January 2024
Questions

Local questions

Anything else, ring Haydn on 01945 669203.

Have you worked in Long Sutton?

Yes. In October 2025 we completed an extension at Long Sutton, groundworks and brickwork, supply and fit.

Do you build drives and yards?

Yes. A brush-finish drive with ACO drains at Sutton Bridge, and a yard, bays and wash bay for RJ Wright Ltd at Sutton St James.

Can you lay ducting for new services?

Yes. At Holbeach we laid 180 m of ducting and 7 jointing pits. Our street works (NRSWA) qualifications cover work in the highway.

Do you hire out plant with a driver?

Yes. A returning customer at Sutton St Edmund books man and machine from us. All our plant operators hold the relevant tickets.

Do you need piles on Holbeach silt?

Not usually on firm, even silt. Soft patches, old dyke lines or a high water table can tip it to piles and a ring beam. Haydn checks at the visit.

Do you build complete houses?

Yes. Our Gedney Hill job ran from the footings to a finished four-bed chalet bungalow. See self-build.

Is the site visit free?

Yes. Plan your project or call Haydn on 01945 669203.

Book a free site visit

Tell us about the job. Haydn comes out, looks at the ground and the access, and gives you a price.

Call HaydnGet a price