Commercial concrete contractors for farms, yards and developers
HB Developments are commercial concrete contractors working across the Fens and East Anglia: reinforced slabs, yards, aprons, power floated floors, wash bays and grain store floors, with the drainage falls, interceptors and steel that make them last. Our own gangs, our own plant, one price from your site plan.
- 600 m³poured on one housing site at Surfleet
- 320 m³poured at Papworth Everard
- £10minsurance through First Point
Concrete works for commercial and agricultural sites
Commercial concrete is a different discipline from a garden base. It carries lorries, loaders and stored crops, it has to shed water to the right place, and it has to stay flat for decades. We build:
- Reinforced slabs for steel frame buildings, workshops and stores.
- Yards and hardstanding for hauliers, farms and depots.
- Aprons in front of sheds and stores, brush finished for grip.
- Power floated floors for grain stores, workshops and warehouses.
- Wash bays with falls, channels and an interceptor. See wash bay construction.
- Grain store floors built for the load. See grain store floors.

Reinforced slabs, drainage falls and interceptors
Every commercial slab starts below the concrete. We dig out to formation, lay and roll a stone sub-base, and fix the reinforcement mesh on chairs so it sits in the right place in the pour, not on the ground. Thickness and steel follow the engineer's design for the loads the slab will carry.
Water is the other half of the job. Yards and wash bays are laid to drainage falls, into channel drains or gullies, and where oil, diesel or detergent can reach the drains we fit an interceptor before anything leaves the site. Joints are planned so the slab cracks where we want it to, not across the middle of the yard.

On site, stage by stage
Our own photographs from the job.



Commercial concrete we have built
- RJ Wright Ltd, Sutton St James: a concrete bay with ACO drains, a yard expansion and a wash bay. See the job.
- Terrington Farms, Whittlesey: a power floated floor inside a steel frame building.
- Whittlesey: grain store floors and brush-finish aprons for a repeat customer. See the job.
- Taylors Bulbs, Holbeach: 180 m of duct broken out and reinstated in concrete and tarmac on a live site. See the job.
- Bourne Town Hall for Probus: foundations, drainage and a breathable floor build-up inside a historic building. See the job.

Our own plant on every pour
We own the machines that dig out, move the stone and roll the sub-base, so a pour day is not waiting on a hire firm:
- Excavators: 1 tonne, 3 tonne, 8 tonne and 14 tonne.
- Dumpers: 1 tonne, 3 tonne, 6 tonne and 9 tonne.
- 14 m telehandler: 3.5 tonne lift.
- 6 m 525 telehandler: smaller than usual, still a 2.5 tonne lift.
- Roller for sub-bases, yards and roads.
- Numerous attachments for every machine.
Concrete is pumped or poured straight from the mixer, then tamped, power floated or brush finished to suit the surface.
From site plan to finished slab
- Send the plan: the area, what it carries and where the water goes. Drawings help; a sketch is enough to start.
- Price: Haydn prices dig, sub-base, steel, concrete, finish and drainage line by line.
- Programme: we agree the dates round your harvest, deliveries or trading.
- Build: our gang digs, stones, fixes, pours and finishes.
- Hand over: a slab cured, jointed and draining to the right place.
Working site? We keep access open and work in phases, as we did for Taylors Bulbs. See also commercial groundworks and agricultural buildings.
What every commercial slab gets
Proper sub-base
Dug to formation, stoned and rolled.
Steel in the right place
Mesh or bar on chairs, to the design.
Drainage falls
Water taken to channels and gullies.
Interceptors
Where oil, fuel or detergent can reach the drains.
The right finish
Power floated, tamped or brush finished.
Planned joints
So the slab cracks where it is meant to.
Own plant
Excavators, dumpers, telehandlers and a roller.
£10m insured
Through First Point.
Jobs that prove it
Real jobs, named places, our own photos.

Yard, bays and wash bay
Commercial concrete for RJ Wright Ltd.
See the job
Grain store floors and aprons
Agricultural concrete floors and brush-finish aprons.
See the job
180 m duct run for Taylors Bulbs
180 m of 125 mm electrical duct through a live site, crossing the main entrance with lorries still running.
See the jobWhat customers say about Haydn and the team
“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
“Excellent service fast and efficient 💪”
Questions developers ask
Anything else, ring Haydn on 01945 669203.
What commercial concrete work do you do?
Reinforced slabs, yards, aprons, power floated floors, wash bays and grain store floors, with the drainage falls and interceptors to go with them.
Do you work on farms?
Yes. Terrington Farms in Whittlesey, grain store floors and aprons at Whittlesey, and a yard and wash bay for RJ Wright Ltd.
Can you work while our site stays open?
Yes. At Taylors Bulbs the site stayed fully operational and we kept lorry access across the main entrance.
Do you own your plant?
Yes: 1, 3, 8 and 14 tonne excavators, 1, 3, 6 and 9 tonne dumpers, a 14 m telehandler, a 6 m 525 telehandler, a roller and numerous attachments.
How do I get a price?
Send a site plan or drawings through the form at the top of this page, or ring Haydn on 01945 669203.
Send the drawings, get a priced package
Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.