Groundworks at Bourne Town Hall for Probus
Groundworks in Bourne do not come more delicate than this. Inside Bourne Town Hall, for Probus, we broke out the old floor to formation alongside an archaeologist, laid a new drainage system and foam glass aggregate so the old building can breathe, cast the foundations and set new time capsules for the Bourne Town Hall trust. All completed on time and in budget.
- On timeand in budget
- 2time capsules set for the town hall trust
- Allmuck away handled by us
- Client
- Probus Ltd
- Location
- Bourne Town Hall, Bourne, Lincolnshire
- Scope
- Breakout to formation with an archaeologist, new drainage, foam glass aggregate, foundations, time capsules, muck away, York stone paths, limecrete screed
- Outcome
- Completed on time and in budget
Rebuild the ground floor of a historic town hall
Probus Ltd brought us in for the groundworks inside Bourne Town Hall. The job sat under the brick arches of a historic building that had to stay standing, dry and intact while we worked beneath it. Every load of spoil came out by mini excavator and tracked dumper, through doorways and past stonework that cannot be replaced.
The scope was clear: break out the existing concrete to formation, work with the archaeologist as the ground was opened, put in a new drainage system, lay foam glass aggregate, form numerous foundations, install new time capsules for the Bourne Town Hall trust, take every load of muck away, then return to lift and relay the York stone paths and assist with the limecrete screed.
Heritage fabric, an archaeologist and no room for error
Old buildings need to breathe. Seal a historic floor with the wrong materials and moisture is driven into the walls. That is why the floor build-up here was foam glass aggregate and limecrete, not a modern slab and membrane.
Every dig was watched. Where the archaeologist needed to record the ground, we stopped, stepped back and dug by hand. Access was through the arcade, so we ran mini excavators and tracked dumpers sized for the doorways and kept the stone piers protected throughout.
On site, stage by stage
Our own photographs from the job.





From breakout to the limecrete screed
- Excavation: broke out the concrete and dug to formation with the archaeologist on site.
- Drainage: a new drainage system laid through the building.
- Foam glass aggregate: installed to let the old building breathe.
- Foundations: numerous new foundations formed and poured.
- Time capsules: new time capsules installed for the Bourne Town Hall trust.
- Muck away: all spoil loaded and taken off site by us.
- York stone: returned to lift and relay the York stone paths.
- Limecrete: assisted with the limecrete screed installation.

On time and in budget for Probus
The work was completed on time and in budget. For a main contractor, that is the whole point of a groundworks subcontractor: the ground floor was ready for the next trade when the programme said it would be, with nothing damaged and nothing to put right.
Heritage, commercial and public buildings need the same discipline as a housing site, plus patience. If you have a listed building, a church, a school or a commercial refurbishment that needs careful groundworks, send the drawings through the form at the top of this page. See our commercial groundworks and drainage pages for more.

The Bourne Town Hall package
Archaeology-led dig
Excavated to formation alongside the archaeologist.
New drainage
A new drainage system through the ground floor.
Breathable floor
Foam glass aggregate under a limecrete screed.
Foundations
Numerous foundations formed inside the building.
Time capsules
Installed for the Bourne Town Hall trust.
York stone
Paths lifted and relaid on our return.
More of our jobs
Real jobs, named places, our own photos.

Nine homes for Rose Homes
Main contractor: ring beams, block and beam, plot drainage and a 3.5 m deep road sewer connection.
See the job
180 m duct run for Taylors Bulbs
180 m of 125 mm electrical duct through a live site, crossing the main entrance with lorries still running.
See the job
175 Hawthorn Bank, design and build
A bespoke four-bed home for Ringwood and Simpson, every trade from piling to decorating run by us.
See the jobWhat customers say about Haydn and the team
“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
“Excellent service fast and efficient 💪”
About this job
Anything else, ring Haydn on 01945 669203.
Who was the client at Bourne Town Hall?
Probus Ltd. We carried out the groundworks package inside the building.
Do you work on heritage buildings?
Yes. Bourne Town Hall needed breathable foam glass aggregate, a limecrete screed, hand digging for the archaeologist and machines small enough for the doorways.
Why foam glass aggregate?
It is a free-draining, insulating layer that lets moisture move out of the ground instead of being forced into old walls. It suits historic buildings with a limecrete floor.
Was the job delivered on time?
Yes. All completed on time and in budget.
Can you work alongside an archaeologist?
Yes. We dug to formation with the archaeologist on site, stopping and hand digging wherever the ground needed recording.
Send the drawings, get a priced package
Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.