Mini excavator and tracked dumper working under the brick arches of Bourne Town Hall during the dig to formation
Case study: heritage groundworks

Groundworks at Bourne Town Hall for Probus

Groundworks in Bourne do not come more delicate than this. Inside Bourne Town Hall, for Probus, we broke out the old floor to formation alongside an archaeologist, laid a new drainage system and foam glass aggregate so the old building can breathe, cast the foundations and set new time capsules for the Bourne Town Hall trust. All completed on time and in budget.

  • On timeand in budget
  • 2time capsules set for the town hall trust
  • Allmuck away handled by us

Send your scheme for a price

Goes straight to Haydn Buffham, the director.

Prefer to talk? Call Haydn on 01945 669203.

Client
Probus Ltd
Location
Bourne Town Hall, Bourne, Lincolnshire
Scope
Breakout to formation with an archaeologist, new drainage, foam glass aggregate, foundations, time capsules, muck away, York stone paths, limecrete screed
Outcome
Completed on time and in budget
The brief

Rebuild the ground floor of a historic town hall

Probus Ltd brought us in for the groundworks inside Bourne Town Hall. The job sat under the brick arches of a historic building that had to stay standing, dry and intact while we worked beneath it. Every load of spoil came out by mini excavator and tracked dumper, through doorways and past stonework that cannot be replaced.

The scope was clear: break out the existing concrete to formation, work with the archaeologist as the ground was opened, put in a new drainage system, lay foam glass aggregate, form numerous foundations, install new time capsules for the Bourne Town Hall trust, take every load of muck away, then return to lift and relay the York stone paths and assist with the limecrete screed.

The challenge

Heritage fabric, an archaeologist and no room for error

Old buildings need to breathe. Seal a historic floor with the wrong materials and moisture is driven into the walls. That is why the floor build-up here was foam glass aggregate and limecrete, not a modern slab and membrane.

Every dig was watched. Where the archaeologist needed to record the ground, we stopped, stepped back and dug by hand. Access was through the arcade, so we ran mini excavators and tracked dumpers sized for the doorways and kept the stone piers protected throughout.

Photos from the job

Our own photographs from the job.

Ground floor of Bourne Town Hall broken out to formation, with the old stone paths lifted and set aside
Ground floor of Bourne Town Hall broken out to formation, with the old stone paths lifted and set aside
Two clear time capsules for the Bourne Town Hall trust laid on the foam glass aggregate
Two clear time capsules for the Bourne Town Hall trust laid on the foam glass aggregate
Membrane laid through the stone arches inside Bourne Town Hall
Membrane laid through the stone arches inside Bourne Town Hall
Excavated floor at the end of the Bourne Town Hall arcade with the original stone flags exposed
Excavated floor at the end of the Bourne Town Hall arcade with the original stone flags exposed
Minimix concrete lorry behind barriers outside the scaffolded Bourne Town Hall
Minimix concrete lorry behind barriers outside the scaffolded Bourne Town Hall
What we did

From breakout to the limecrete screed

  • Excavation: broke out the concrete and dug to formation with the archaeologist on site.
  • Drainage: a new drainage system laid through the building.
  • Foam glass aggregate: installed to let the old building breathe.
  • Foundations: numerous new foundations formed and poured.
  • Time capsules: new time capsules installed for the Bourne Town Hall trust.
  • Muck away: all spoil loaded and taken off site by us.
  • York stone: returned to lift and relay the York stone paths.
  • Limecrete: assisted with the limecrete screed installation.
Foam glass aggregate spread across the floor of Bourne Town Hall under the timber ceiling
Foam glass aggregate spread across the floor of Bourne Town Hall under the timber ceiling
The outcome

On time and in budget for Probus

The work was completed on time and in budget. For a main contractor, that is the whole point of a groundworks subcontractor: the ground floor was ready for the next trade when the programme said it would be, with nothing damaged and nothing to put right.

Heritage, commercial and public buildings need the same discipline as a housing site, plus patience. If you have a listed building, a church, a school or a commercial refurbishment that needs careful groundworks, send the drawings through the form at the top of this page. See our commercial groundworks and drainage pages for more.

Membrane laid the full length of the Bourne Town Hall arcade ready for the limecrete screed
Membrane laid the full length of the Bourne Town Hall arcade ready for the limecrete screed
The package

The Bourne Town Hall package

01

Archaeology-led dig

Excavated to formation alongside the archaeologist.

02

New drainage

A new drainage system through the ground floor.

03

Breathable floor

Foam glass aggregate under a limecrete screed.

04

Foundations

Numerous foundations formed inside the building.

05

Time capsules

Installed for the Bourne Town Hall trust.

06

York stone

Paths lifted and relaid on our return.

Reviews

What customers say about Haydn and the team

“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
Marc MatthewsRecommends HB Developments on Facebook, October 2024
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
George WrightRecommends HB Developments on Facebook, February 2024
“Excellent service fast and efficient 💪”
Tom WrightRecommends HB Developments on Facebook, January 2024
Questions

About this job

Anything else, ring Haydn on 01945 669203.

Who was the client at Bourne Town Hall?

Probus Ltd. We carried out the groundworks package inside the building.

Do you work on heritage buildings?

Yes. Bourne Town Hall needed breathable foam glass aggregate, a limecrete screed, hand digging for the archaeologist and machines small enough for the doorways.

Why foam glass aggregate?

It is a free-draining, insulating layer that lets moisture move out of the ground instead of being forced into old walls. It suits historic buildings with a limecrete floor.

Was the job delivered on time?

Yes. All completed on time and in budget.

Can you work alongside an archaeologist?

Yes. We dug to formation with the archaeologist on site, stopping and hand digging wherever the ground needed recording.

Send the drawings, get a priced package

Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.

Call HaydnGet a price