Aerial view of the Ramsey development with plots at footings and block and beam and two poured slabs
Cambridgeshire

Groundworks across Cambridgeshire for developers and housebuilders

HB Developments delivers groundworks in Cambridgeshire from our yard at Newton, near Wisbech. We have dug, piled, drained and bricked plots from Ramsey to Papworth Everard, poured grain store floors at Whittlesey, and we price developer packages and homeowner jobs right across the county.

  • 9 homesgroundworks and road drainage at Ramsey
  • 7 plotsdug out in the first week at Ramsey
  • £10minsurance through First Point

Send your scheme for a price

Goes straight to Haydn Buffham, the director.

Prefer to talk? Call Haydn on 01945 669203.

For developers

Groundworks packages for Cambridgeshire developers

Send us a layout and a plot schedule and we price the packages you need, line by line: site clearance, footings, piles and ring beams, block and beam, plot drainage, roads and sewers, and brickwork from DPC to wall plate. One contractor carries the plot from the first dig to the roof, so your programme does not stall between trades.

Sites are run under SMSTS site management. Every employee carries a CSCS card, every plant operator holds the relevant tickets, and our street works (NRSWA) qualifications let us open and reinstate the highway for connections and bellmouths. See the full scope on groundworks for developers, or go straight to send drawings for a price.

Proof

Cambridgeshire sites we have delivered

Ramsey, nine homes. We started on site in August 2025 and had seven plots dug out in the first week. Footings, ring beams, block and beam, road drainage and the plot groundworks followed, all complete by January 2026, for Rose Homes. Read the Ramsey project.

Papworth Everard. A groundworks and brickwork package from June to November 2025: reinforced footings set out tight to an existing house, then the brickwork up, with Minimix supplying the concrete. See Papworth Everard.

Whittlesey. Grain store floors with a knocked-in finish, a power-floated floor and brush-finish aprons, May to September 2025. Agricultural concrete is the same discipline as a housing slab: the sub-base and the falls decide how long it lasts. See the grain store floors.

Reinforced footings set out beside an existing house on the Papworth Everard site
Reinforced footings set out beside an existing house on the Papworth Everard site
Ground conditions

Two kinds of ground in one county

Cambridgeshire splits in two. North of the A14 is the Fens: marine silt round Wisbech, and peat and soft clay round March, Whittlesey, Ramsey and Chatteris. Peat shrinks as it dries out, so strip footings that work on firm silt settle here. On those plots we design for piled foundations with a cast ring beam, or take the footings down to firm ground.

South and west, round Papworth Everard, Cambourne and Cambridge, the ground turns to clay. Clay swells when wet and shrinks in a dry summer, and trees make it worse. Footing depth follows the clay and the trees, with heave protection where building control asks for it. Our piled vs strip foundations guide explains the choice.

Groundworker finishing a new concrete grain store floor inside a steel frame building at Whittlesey
Groundworker finishing a new concrete grain store floor inside a steel frame building at Whittlesey
Adoption

Roads, sewers and approvals in Cambridgeshire

Estate roads built for adoption go through a Section 38 agreement with Cambridgeshire County Council as highway authority, and any work on the existing road, such as a new junction or footway, goes through Section 278. Peterborough is the exception: Peterborough City Council is its own highway authority. Foul and surface water sewers are laid to Anglian Water's standards for adoption under Section 104.

Across the Fens there is a third party to plan for: the internal drainage board. Discharging surface water to a dyke, or working near one, needs the board's consent. We build all of this into the programme from day one. Read more on S38 and S278 road works and the Section 104 guide.

For homeowners

Groundworks for Cambridgeshire homeowners

The same crews take on private work. We laid extension groundworks at Ramsey with our partners AJB Group, a shuttered shed base at Wisbech St Mary, and a driveway, fencing, kerbs and gates for a private customer in March. On larger jobs we do the lot: extension foundations, septic tanks and treatment plants for homes off the mains, and self-build plots from footings to finished house.

Haydn visits free, looks at the ground and the access, and prices the job. Plan your project to start.

The package

Where we work in Cambridgeshire

01

Wisbech and villages

Our home patch: Gorefield, Guyhirn, Wisbech St Mary, Murrow and Parson Drove. Wisbech groundworks.

02

March, Whittlesey and Chatteris

Peat and clay country, with the Whittlesey grain store on our list. March and Whittlesey.

03

Peterborough

The city plus Thorney, Eye and Yaxley, with Ramsey and Whittlesey close by. Peterborough.

04

Cambridge and the south

Clay ground, extensions and infill plots, proven at Papworth Everard. Cambridge.

Reviews

What customers say about Haydn and the team

“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
Marc MatthewsRecommends HB Developments on Facebook, October 2024
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
George WrightRecommends HB Developments on Facebook, February 2024
“Excellent service fast and efficient 💪”
Tom WrightRecommends HB Developments on Facebook, January 2024
Questions

Local questions

Anything else, ring Haydn on 01945 669203.

Do you take on full developer packages in Cambridgeshire?

Yes. Groundworks, piling and ring beams, roads and sewers, S104 drainage, brickwork and full new build. At Ramsey we carried nine homes through footings, ring beams, block and beam and road drainage. Send your drawings for a price.

Who adopts roads and sewers in Cambridgeshire?

Cambridgeshire County Council adopts estate roads under Section 38 and approves highway works under Section 278. Peterborough City Council does both inside Peterborough. Anglian Water adopts sewers under Section 104.

Do you pile on Fen peat?

Yes. Where the ground needs it we pile and cast a ring beam on top, as on our own Plot 2 at Weston Hills. A Google reviewer, ColeS, wrote that we "undertook a full piled foundation ground works package" and it was "delivered on time and within budget".

Can you do the brickwork as well?

Yes. Papworth Everard was a groundworks and brickwork package, so the same team took the plot from footings to the walls.

Do you work for homeowners in Cambridgeshire too?

Yes, across the county, from extension foundations and concrete bases to septic tanks and self-build plots. Haydn visits free. Call him on 01945 669203.

Send the drawings, get a priced package

Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.

Call HaydnGet a price