Piled foundations at Wiggenhall St Germans, with a new drain and culverts
Piled foundations at Wiggenhall St Germans, near King's Lynn: four new plots piled, including the design, with HB Developments assisting on the design of the builds. Before a house goes up, the land has to drain, so we dug, cut and shaped a new drainage board drain and installed two new culverts.
- 4plots piled, design included
- 2new culverts installed
- 1new drainage board drain
- Site
- Four new plots
- Location
- Wiggenhall St Germans, King's Lynn, Norfolk
- Scope
- 4 plots piled including design, design assistance on the builds, a new drainage board drain dug, cut and shaped, 2 new culverts
- Status
- Plots piled and drained; full build set to commence mid 2026
Four plots on Norfolk marshland
The site at Wiggenhall St Germans is four new plots on flat Norfolk marshland. The ground needed piles, and the land needed a proper outfall. Our job was to get the plots out of the ground: setting out, piling with the design included, and the drainage that keeps the site dry.
We also assisted with the design of the builds, so the foundations, the drainage and the houses were thought through together.

Soft ground and drainage board rules
On the Fens and the Norfolk marshes, ground water and drainage boards set the rules. A new drain that joins the board's network has to be dug to the right line, depth and bank profile, with culverts where access crosses it. Get it wrong and the plots sit in water every winter.
The soft ground under the plots needed piles to reach a bearing layer. Piling is run through our trusted piling partner today, and our own piling rig arrives by the end of December 2026. Read our piled vs strip foundations guide for why.
On site, stage by stage
Our own photographs from the job.


Set out, piled, drained and culverted
- Set out the four plots.
- Piled all four plots, including the design.
- Assisted with the design of the builds.
- Dug, cut and shaped a new drainage board drain.
- Installed two new culverts.

Plots ready for the build
The plots are piled and the land drains to a new, properly shaped drain with two culverts carrying access across it. The full build was set to commence in mid 2026.
If your land needs piling, a drain or a culvert before you can build, send the drawings through the form. See piled foundations and groundworks in King's Lynn.
How we run a package like this
Every job starts with the drawings and a conversation with Haydn, the director. He prices the package line by line, agrees the programme with your site manager and stays the point of contact until the last load leaves site. Our sites run under SMSTS site management, every employee carries a CSCS card, every plant operator holds the relevant tickets, and we carry £10 million of insurance through First Point.
Send the drawings through the form at the top of this page, or call Haydn, and you will have a priced package back with a start date.
The Wiggenhall St Germans package
Setting out
Four plots set out on site.
Piling
Four plots piled, design included.
Design input
Assisted with the design of the builds.
Drainage board drain
A new drain dug, cut and shaped.
Culverts
Two new culverts installed.
More of our jobs
Real jobs, named places, our own photos.

Nine homes for Rose Homes
Main contractor: ring beams, block and beam, plot drainage and a 3.5 m deep road sewer connection.
See the job
175 Hawthorn Bank, design and build
A bespoke four-bed home for Ringwood and Simpson, every trade from piling to decorating run by us.
See the job
High-spec bungalow, our own
2 m deep footings, 80 m³ of concrete and 600 tonnes off site in a week. On the market at £375,000.
See the jobWhat customers say about Haydn and the team
“Just OUTSTANDING from start to finish, nothing was too much trouble and communication was fantastic throughout the process would absolutely recommend him.”
“Competitive rates,would highly recommend. I’ve had many jobs done, all been completed to 100% satisfaction.”
“Excellent service fast and efficient 💪”
About this job
Anything else, ring Haydn on 01945 669203.
Where is Wiggenhall St Germans?
On the River Great Ouse south of King's Lynn, in West Norfolk. We are based near Wisbech, a short run away.
Do you design the piling?
Yes. At Wiggenhall St Germans the four plots were piled including design. Piling is run through our trusted piling partner today, and our own piling rig arrives by the end of December 2026.
What is a drainage board drain?
A drain that joins the internal drainage board's network. It has to be dug, cut and shaped to the right line and bank profile so water leaves the land.
Can you install culverts?
Yes. We installed two new culverts at Wiggenhall St Germans so access can cross the new drain.
When does the build start?
The full build was set to commence in mid 2026.
Send the drawings, get a priced package
Plot numbers, packages and a start date are enough to begin. Haydn prices it and comes back to you.